Thanks to you, we are celebrating our 25th anniversarywww.backup.transformingla.org Founding Festival

www.backup.transformingla.org

For more informationHere
My Store My Store change
  • Same-day delivery
  • advertisement
  • Can be placed
  • In-store pickup

HOT ! Hanes Women's Curves Sheer Black Tights HSP006

※www.backup.transformingla.org Limited model
YouTubers have introduced us to the usability of our products!
Introducing video here

Online sales
Price (tax included)

14USD

  • Register your Komeri Card Number and pay with Komeri Card
    Comeri Point : Earned 5 points

About Komeri Points

Reduce the number of items purchased
Increase the number of items purchased

Pick up at the store Pick up at the store
(Free shipping)

Pickup store:

Choose a shop

Check nearby stores

Estimated delivery time:

Order by

1pm → Prepare by 5pm

5pm → Prepare by The next morning

How to receive and shipping fees

Add to Cart

Delivery Delivery

Estimated delivery time:

Delivery is scheduled for around 2026/01/19.

Cash on delivery is limited to credit or cash on delivery. For other payment methods, please refer to here.

*It may take some time for the product to be delivered on January Wednesday, or public holidays, and depending on stock availability.

Regarding same-day shipping conditions

How to receive and shipping fees

Add to Cart

Add to wish list

Added to wish list

More information about Hanes Women's Curves Sheer Black Tights HSP006

  • Fabric type: 83% Nylon, 17% Spandex
  • Care instructions: Hand Wash Only
  • Origin: Imported
  • CONTROL TOP: Embrace a flawlessly smooth look with tights that contour & enhance your natural shape; The built-in control top’s design smooths your midsection without sacrificing flexibility while feeling secure with effective shaping & smoothing
  • SHEER TOE: Step into the spotlight with our sheer toe hosiery, designed to complement your sandals & open-toe shoes; Whether you’re heading to a special event or elevating your everyday look, flaunt your footwear without sacrificing style or comfort
  • GLIDE-ON EASE: Hanes Curves Pantyhose are designed for those who value both elegance and convenience; The sheer, silky soft finish of these stockings makes slipping them on a breeze, allowing you to enjoy a luxurious feel without any hassle
  • RUN-RESISTANT: Enjoy peace of mind with run-resistant technology, designed to prevent snags and runs, ensuring long-lasting wear and a flawless appearance wear after wear; Say goodbye to the frustration of ruined hosiery
  • COMFORTABLE & COOL: Wicking Cool Comfort technology is designed to keep you cool and comfortable in your stockings all day long by actively wicking away moisture away from your skin, ensuring you stay dry and fresh, no matter the conditions

    Hanes Women's Curves Sheer Black Tights HSP006 1

    Hanes Women's Curves Sheer Black Tights HSP006 2

    Hanes Women's Curves Sheer Black Tights HSP006 3

    Hanes Women's Curves Sheer Black Tights HSP006 4

    Hanes Women's Curves Sheer Black Tights HSP006 5

    Hanes Women's Curves Sheer Black Tights HSP006 6

Search for products in the same category

Bestseller ranking

View more this category

People who viewed this product also viewed these products

Products from nearby sales areas

View more this category

Customer reviews

Recommendation level  4.3

Currently, 110 reviews have been posted.